Comparable quote checklist

NorthField Sourcing RFQ checklist

Close the open choices on paper first. A checklist is not a purchase order and it is not a code approval.

Marked-up floor plan and load notes on a site table

Order of checks

  1. 1

    Use

    Occupancy, permanent or relocatable, and any later phase.

  2. 2

    Size

    Module dimensions, eave height, clear span, bay spacing.

  3. 3

    Loads

    Wind speed, ground snow load, seismic design category, live and dead loads.

  4. 4

    Scope

    Shell, delivered, installed or turnkey, each with its exclusions.

  5. 5

    Proof

    Which drawing, calculation and quality file belongs to the quoted system.

Fields that keep two replies comparable

Building

FormatVolumetric, panelized, folding or a primary frame with purlins and girts
EnvelopeInsulated metal panel target, thermal transmittance or R-value, fire-resistance rating of the rated wall
InterfacesFoundation interface, utility stubs, crane lift plan, transport envelope

Commercial

QuantityCount of modules or building sets, and whether partial shipments are allowed
DestinationZIP code, receiving hours, and who owns unloading
Budget noteOptional USD figure, per module or whole order. A preference for premium, mid-range or budget-friendly suppliers is a buyer wish, not a rating

Standard layouts shorten the comparison only when the published options already fit. A custom clear span needs its own engineering note. Shell pricing leaves the foundation and the local trades with the buyer. Turnkey language still needs a list of exclusions. Those two disputes are decided on the brief, not by a slogan.

Checks before an alternative is accepted

Which specification choices are still open?

Any blank load, any unstated insulation value, any door that is drawn but not sized, and any finish that appears only in a photo. Mark each one open. Do not copy a number from a different climate to look complete.

What should be verified on the alternative itself?

The supplier name, the system name, the member list, the coating, and the jurisdiction the calculation used. A similar floor plan is not the same transport weight. Ask for the sheet that matches the quotation line.

Where do code names sit on this list?

IBC, IRC, HUD Code, ASCE 7 and AISC 360 are names of documents to request when they apply to that system and that city. They are not badges owned by NorthField Sourcing. AWS D1.1 is a welding question for a steel scope, not a blanket claim.

Send the checklist as a requirement

  • Use, dimensions and jurisdiction on the first pass
  • Quantity and destination even if the date is a window
  • Scope word kept separate from freight and tax
  • Unknown loads written as unknown

Include specifications, quantity, destination and delivery timing. Shell, delivered, installed and turnkey prices are different scopes.